Brewster Street Culvert Realignment

Project Name:
Brewster Street Culvert Realignment

Client:
Lismore City Council

When:
2024 – 2025

Services:

  • Engineering

The Brewster Steet Culvert Realignment forms part of the Lismore Flood Restoration Program, a major initiative aimed at improving flood resilience across the Northern Rivers region following the 2022 flood events.

The project focuses on reducing localised flooding by relocating services and realigning the existing culvert beneath Brewster Street and Browns Creek to address hydraulic constraints affecting the surrounding area.

NDC was engaged by Lismore City Council’s Flood Restoration Portfolio to provide civil engineering design services for the project. Our role included reviewing hydraulic, survey and environmental assessment information, developing infrastructure solutions to improve flood conveyance, preparing staged design submissions, cost estimates and construction documentation and supporting the progression of the project through detailed design development.

The project will improve flood resilience within a key urban area of Lismore by reducing the impacts of heavy rainfall events and enhancing the performance of critical drainage infrastructure. As part of the broader regional recovery effort, the project contributes to creating a more resilient community and supporting the long-term functionality of essential public infrastructure.

Contact Us

Drop files here or
Max. file size: 256 MB.